Workshop drainage – Part 2

Took me over a hour to remove that star pickett, no room for the crowbar so had to use that garden trowel digging on only one side – phew.

Lucky that I have this one and only 4.3M 90mm PVC pipe leftover from a previous job.

 

 

 

 

 

 

OK… let’s slide it in there.

 

 

 

 

 

 

Looking good…

 

 

 

 

 

 

At that point the slope is well below the slab so the water can just pool and find it’s own way around the pole down to the bottom and drain off.

 

 

 

 

 

That worked out well.

 

 

 

 

 

 

Move the large paver back in place so for now I can close the door.

I’ll be back…

 

 

 

 

 

Unknown's avatar

Author: AlanM52

Retired

Leave a comment