Workshop drainage – Part 2 Took me over a hour to remove that star pickett, no room for the crowbar so had to use that garden trowel digging on only one side – phew. Lucky that I have this one and only 4.3M 90mm PVC pipe leftover from a previous job. Continue reading “Workshop drainage – Part 2”