Al’s Kitchen – ALDI cast iron pot of chicken curry on simmer…:-)
Day: April 18, 2020
More rain coming get mowing done.
With more rain on the way first job on the list this morning was to get the mowing done. Grass has grown to that point where poo bombs are too hard to spot from a safe distance (in particular when it’s raining) before going out there to collect…:-)
Batman lights – first lot (part 10)
Batman lights – first lot (part 10)
Doing final assembly on KIETH and ERIC so both of those will be finished in the first morning session – tomorrow.
While doing the above also nudging PJ along so he is now ready for the lighting stage.
And…while doing all the above also prepping TAG, one of the bats from the second lot…:-)
The last photo shows how I measure to mark and drill the staple pilot holes.
Batman lights – first lot (part 9)
Batman lights – first lot (part 9)
Al’s Kitchen
POST: 2020-04-18T15:36:23+10:00
Another couple of Batman orders – Crikey
Also working on a larger USB version (not much bigger) that will hide a optional flat Powerbank at the back with 3 x AA battery box the default option. Price increase of $20 to cover the Powerbank cost.
Another couple of Batman orders!
Get the mowing done
With more rain on the way first job on the list this morning was to get the mowing done. Grass has grown to that point where poo bombs are too hard to spot from a safe distance (in particular when it’s raining) before going out there to collect.