Scroll saw project – update 11

With the garden work done for council collection we are clear to potter in the workshop. Bloody cold miserable day but the gas heater has raised the temp in the shop from 7° to 12° plus, with some assistance from the Tangi heater.

IMG_20180819_122843
Doing some electrical wiring, the jigsaw plugs into the surface socket and…

Continue reading “Scroll saw project – update 11”

Scroll saw project – update 10

With the garden work done (last four days) and ready for council collection next week it’s good to get back in the workshop to continue the scroll saw build- yay

IMG_20180818_162736
Decided to switch from plain to the pinned type of blade. The plain type (no pin) just keeps coming loose no matter how tight I do up the clamp screws. Things are more secure now and I can even wind up the saw speed a bit more.

Continue reading “Scroll saw project – update 10”

Annual council collection 2

Still working on the green stuff for annual council collection. As mentioned there are three areas and all the lopping is done which is a good start considering we have a dodgy back.

1
This is Area 1 – this photo from the previous session with half the Bay Leaf tree lopped. Todays job is to bundle and stack this lot outside. There are two other areas to be done tomorrow and I hope the kids turn up to help or I could miss the boat.

Continue reading “Annual council collection 2”