Chook annex – rebuild

The main chook run has a annex which is one of our previous gazebo’s with wire mesh around the sides, chicken wire above and a tarp over that. I’m going to pull all that down and rebuild the anexe (same as the main run) with star pickets, poles, pine framing with gable and a polycarb roof – and new gate/door.

20151101_164921

20151101_164927

20151101_164939

This pile waiting for the green bin to be collected – next Wednesday.

Author: AlanM52

Retired

Leave a Reply

Your email address will not be published. Required fields are marked *