We are upgrading ET’s 1997 Lancer GLXi to a 2006 model.
MY06 Lancer ES with the 2.4lt MIVEC engine.
|
We should be getting the car tonight or over the weekend…more to come. |
Back around Christmas I did some roof maintenance, the ridge cap tiles (in particular) were letting water in and badly needed re-pointing. So off to Bunnings to purchase a bucket of Selleys Point Works Gen II.
and then up on the roof on a cooler day with the bucket of pointing mix, small trowel and knee pads etc.
Above: No need to be to fussy up here it’s a two story house, so I put on plenty. This stuff is good, great bonding and very strong – like granite. I still need to do the corners but before this the Dutch gables need my attention.
Above: this is the south end Dutch gable.
Above: Close-up of the previous picture.
Above: This is the north end, nowhere near as bad but still needs to be replaced.
The weather boards need to be cleaned up and painted as well.
I am tempted to pressure wash the tiles but something tells me to just leave them alone. As I said it’s a two story house and you can’t really see much of the roof from ground level.
In our street water was lapping onto the nature strips.
In the next street down from us the road was a river!
Checkout the video clip below (poor light conditions).