Al’s Workshop updates

Al’s Workshop updates
Another busy day with bats flying out the door but still feel like I’m threading water. This morning released a pair in the direction of Warragul – safe trip guys.
Did some more work on jobs then off on the usual Monday shopping trip including posting those two bats to Warragul I was surprised that 2 x Bats @ 1,2kg was $15.35 when last time 1 x Bat @ 0.6kg cost over $18. Thanks to Holly (see next photo) I packed the items so well there was no need for one of their pricey bags (y)
Back home and out again to do some more including cutting more MDF blanks. After tea ended up doing two hours overtime to catch up a bit – with heaters on.

Batman lights – first lot (part 10)

Batman lights – first lot (part 10)
Doing final assembly on KIETH and ERIC so both of those will be finished in the first morning session – tomorrow.
While doing the above also nudging PJ along so he is now ready for the lighting stage.
And…while doing all the above also prepping TAG, one of the bats from the second lot…:-)
The last photo shows how I measure to mark and drill the staple pilot holes.