From the last session prepared the cables with connectors.
![]()
Now to run the cables down and into the base box.
![]()
![]()
Working down had to use an extension on the spade bit to drill a hole in this top corner of the base box.
![]()
Into the base box and across to the hook up point.
Wired the switch. The squashed female bullet connectors, with a final push with both thumbnails, mated well with the spade terminals. The sleeves themselves were a nice push fit into the rectangular terminal holes.
![]()
For any electrical work I always reach for the RCD.
![]()
Wired the terminal block, plugged into RCD and pressed the green button on the NVR switch – she works ![]()
![]()
Will tidy up the slack later, off inside now for a shower and some air-con.
![]()
I was tossing up between a couple of jobs which one to do next but now neither, blade guard on the left is next. Yes…that blade is close to the switch – Crikey.