Afternoon session to continue with the blade guide arm construction.
Screwing down the MDF pieces that clamp the sliding arm.
Sanded the filler strip (has the up marker arrow) and put in two screws.
View from the back.
Afternoon session to continue with the blade guide arm construction.
Screwing down the MDF pieces that clamp the sliding arm.
Sanded the filler strip (has the up marker arrow) and put in two screws.
View from the back.