14” Bandsaw-Vertical post preparation

I need to know exactly where to locate the top edge of the upper wheel assembly horizontal support arm and mark that off on the vertical support. For that we need to measure the distance between the shaft or bearing centres plus allow for thickness of the tyres and then subtract from that figure enough slack clearance to allow the blade to slip onto the wheels.

20180106_111639
To measure the centres the blade needs to be mounted on the wheels, don’t want to fiddle with something that has very sharp teeth so as before I’ll use banding tape in place of the blade.

20180106_112108
Wrapped the tape around the blade and held it on with cloths pegs

20180106_112330
Slightly tensioned the tape, marked the ends and cut off the excess. Then wrapped the join with masking tape. Put the tape on the wheel and when I took up the slack it came apart – need a stronger joint.

20180106_114919
Set it all up again and this time used super glue and then put on croc clamps – let it dry.|
Once again wrapped the joint with masking tape,

20180106_112542
This time it held, was able to gently tension the tape so I could measure the centres – 71cm.

IMG_20180106_212501

Made all the calculations and marked off the height on the vertical post.

Unknown's avatar

About AlanM52

Retired
This entry was posted in Bandsaw 2018, Workshop. Bookmark the permalink.