Mounting the bearing flanges on the upper wheel.
![]()
Pressed in the bearings and pre drilled the flanges.
![]()
Preparing to mount the first bearing flange.
![]()
When I turn the wheel around to mount the second flange need to make sure to skew it a bit so the screws don’t run into each other.
![]()
Still need to setup a pointer on the rim to act as a wobble indicator. The idea is to slowly turn the wheel and tap gently to reduce wobble to a minimal amount…more to come.