As mentioned worked out how to mount the skateboard bearings (with those bloody flanges) onto the Melamine bandsaw wheels. We can now get started actually building the thing.
![]()
Made some laminate flooring washers that have been recessed to house the outside of the bearings.
![]()
This is a mock-up, using a lock nut rather then a plain nut. The wheel will of course be mounted on threaded rod shafts.
![]()
After this we can use the wheels to start laying out the main frame.
![]()
The blade I bought for the saw is 1400mm x 6.35mm x 14 TPI. I wrapped a IKEA tape measure around the blade and taped it off at the 1400mm mark. Here I am using the ‘tape blade’ to assist with laying out the main frame, in particular the wheel centers.
![]()
I need to cut four panels that will be sandwiched together to form the main frame.
![]()
Ripping them up on the table saw.
![]()
![]()
Four stacked panels with the wheels on top, helps to form a mental picture.