The main chook run has a annex which is one of our previous gazebo’s with wire mesh around the sides, chicken wire above and a tarp over that. I’m going to pull all that down and rebuild the anexe (same as the main run) with star pickets, poles, pine framing with gable and a polycarb roof – and new gate/door.
This pile waiting for the green bin to be collected – next Wednesday.