Another afternoon working on the cat run and still not finished – never mind. Travelling time chews up on-site job time, the round trip is about 80 mins.

Above: Still have to mesh the front at the end there.

Above: This part where the main run joins the annex caused some head scratching but we came up with a neat solution.

Above: General view of the job site.

