Daily Archives: 11/05/2025

The Pod Project – 9

Another late start but I have refined the procedure steps from gravel bed to checking that the bubble is inside the lines which should speed things up with less energy input. We are doing the back right pad and using … Continue reading

Posted in Backyard POD, Projects 3 | Leave a comment