The Pod Project – 7
Feeling good starting this session we get to do more interesting like measuring up the site for the pod foundations.

There we have it… the pod location.
At 5.0M x 2.4M it looks larger than I envisaged!
The string line across the middle is my base reference for the welded steel pod base frame.

All I did was plonk the bricks on the ground let’s see where the level is sitting

A bit low on the right side that’s fine.

Each pad will have a gravel base with one or more pavers (depending on ground slope) with Half Besser block on top.

The center string line is my base reference.
That length of timber across the front conveys a picture of how high the pod is off the ground. I am quite chuffed about my idea to use a half block to give it that height.
Also picture a front porch deck set to a height that allows for a normal step (150mm – 180mm) into the pod.
Weather tomorrow is good although high winds are expected up to 45km/h – bugger.
I’ll be back…