The Pod Project – 6

The Pod Project – 6
In the session we finished prepping the site so we can start work on the foundations – yay


Still moving veggie box soil to clear the pod site.


Nearly there…


Now we only have to remove the buried annex wire mesh apron that was buried there to prevent Mr. Fox digging to get inside.


Looking good… moved everything away and mowed the grass for laying out the string lines. The timber identifies the left front corner of the pod location. The side timber is the right length @ 2.4M but the front is to short so I need to extend tha to 5.0M.
There is enough at the back to wheel through the tradie wheelbarrow.


Looking forward to getting the foundations done so I can notify the team to transport the dismantled pod over to our place.

I’ll be back…

 