Back for another session.
About to start another session. With the wire mesh on the left side of the annex front removed we need to remove the staples on the right side the along the side and along the back of the annex. Note – That is one continuous length and with the veggie boxes there it’s going to be a PIA to remove the bottom plinth board staples.
Wire mesh staples have been removed from the right side.
Using a Matic to dig down to bottom of plinth board.

With the side wire mesh released the back section is next and we have to move all that stuff and those shed panels will need to be shoved further down to clear the chicken run corner.
I’ll be back…