With the door and frame assembled we can now start working out how to mount the water valve with a string connection to the top of the door – new ground.

As usual the instruction leaflet is unreadable and no wonder ‘they’ always wear glasses! I have some thoughts about how to connect the valve actuator arm via string or cord to the. top of the door. I want to try a pully I know we have some but can’t find them. I’ll make one.

I am removing the router fence and setting up my own pully cutting fence.

We need to change over to a “V’ grooving bit.

With that done let’s setup a plywood disc (hole saw cut-outs from a previous project) on the jig fence.
We need to check that the fence is adjusted correctly so the bit is cantered on the rim of the disc. With the router turned on I slowly raised the bit to nick the disc rim – that’s good.
I’ll be back…
