Workshop drainage – Part 10

Weather cleared nicely; was able to go out and do some more like back fill the drain with soil and back fill the top end of the PVC pipe with gravel.

 

I used that same thin piece of plywood as a dirt guard when filling and tamping down the soil.

 

 

 

 

 

 

Sitting on my little Pixie stool there were no complaints from my back as I worked my way along to the corner grate.

 

 

 

 

 

PVC pipe this side of the big concrete paver is back filled – yay

 

 

 

 

 

 

A bit more tidy-up cementing to finish this corner.

 

 

 

 

 

 

Stopped back filling here because…

 

 

 

 

 

 

… we have some more to do here.

Had to remove the fence star picket that was screwed to that corner pine post to run the PVC pipe.

 

 

 

 

 

Planning to use a 1/2 round pine pole that will be screwed to the chook run corner timbers with some concrete at the bottom.

 

 

 

 

 

Will end up looking like this.

 

 

 

 

 

 

I’ll be back…

Unknown's avatar

About AlanM52

Retired
This entry was posted in Projects 2, Workshop Drainage. Bookmark the permalink.

Leave a comment