Been busy doing other things but now back to this project.
Back from Bunnings with more bags of concrete mix and backfill pebbles.
We need to fill the gap between the slab drip lip and the drain. I am tucking a narrow length of plywood on the gutter side and pouring in the dry concrete mix with a small scoop.
Pour in some water for about one meter, scoop in concrete, tamper down and a bit more water. Repeat and when filled to top trowel surface.
Move to next section distance is 4 meters.
Phew… need to rest back and knees.
Next job is to make the DIY PVC connection.
I’ll be back…