Scroll saw project – update 3

This will be a interesting session as we are going to mount the saw arm bearings and install the assembly onto the saw frame.

1
With the arm support column dismantled I marked out the bearing centres on the two supports in preparation to bore the bearing mount holes.

23
Here we are drilling the 9mm recessed holes with a 29mm hole saw. The bearings are 30mm OD. And now clean out the holes with a 25mm Forstner bit.

5
That’s a perfect squeeze fit, simply tap the bearing in flush with a scrap wood drift to protect the bearing.

6
Both column supports are done, now to reassemble onto the saw frame.

IMG_20180809_132052IMG_20180809_132221
Before we install the saw arm this is a good time with the saw frame upside down to screw down the base.

IMG_20180809_134425
Everything here is 10mm. Working from one side we have to feed the rod through while threading on nuts and washers in the correct order.

IMG_20180809_134437
Finally with the are centered in the supports screw on the second lock nut with a tube spanner.

IMG_20180809_134333

IMG_20180809_134413

Enough for this session.